Project: Whammdyne1   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Ron Gawer   -  
Project:   Vans - RV-10
Total Hours:833.1
Total Flight Time:
Start/Last Date:Dec 08, 2020 - No Finish Date
Engine:IO-540-X
Propeller:WW 330-3B-A/78G-78-S-R
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Whammdyne1

Home or Last Project Picture

Jul 04, 2021     Elevators 9-15, steps 1, 2 & 8 - (3.9 hours)       Category: Empennage
Completed the trailing edges and closed out the skins, and then milled the lead weights to dimension.

I did paint the trailing edge out; there is an opening that I can reach a nozzle in to for future Corrosion X control, but it's also small, so hard to inspect, except by borescope. I primed it, as I will the trim tabs, as an additional measure.

The trailing edge riveting, much like the rudder, was very easy with the squeezer.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.